- Contact: Felipe Iglesias
- Title: Business Development Director
- Languages: English, Portuguese, Spanish, French, and Chinese
- E-mail: [email protected]
- Tel / WhatsApp: +86 13126536955
- Address: No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470
How do you request a lead-time and capacity breakdown?
Send your STEP, IGES, or 2D drawing to [email protected]. The response includes a design-for-manufacturing review, the process-step count, the delivery tier your part falls into, and the loading behind the date. That breakdown is what turns a quoted date into something you can verify and hold.
Who is the contact person?
Felipe Iglesias handles inquiries at [email protected] and +86 13126536955, working in English, Portuguese, Spanish, French, and Chinese. Scheduling and capacity questions can be raised directly in the language you prefer, without a translation layer slowing the answer.
Where is the factory located?
The facility is at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470. A factory visit is welcome, and a live video walk of the floor is available for buyers who cannot travel — the point is to let you verify the capacity behind the date yourself.
What should you include when you request a quote?
A complete package removes the clarification loops that otherwise show up as added setup time and a slipped schedule. Include a 3D model (STEP, IGES, or STP), a toleranced 2D drawing (DWG, DXF, or PDF), the material grade, the quantity, and your target date. Ambiguity is a hidden tax on lead time, and a clean drawing is the cheapest way to avoid paying it.
Can you confirm the delivery date before committing?
Yes, and the confirmation comes with the logic, not just the date. The quote states the step count, the delivery tier, and the loading assumptions, so the schedule is something you can hold the factory to. A date with no stated logic is a wish, not a plan, and it is the first thing to distrust in any quote.
How does the first article fit into your schedule planning?
With an MOQ of 1 piece, the first article runs before the production order is scheduled. Order it early, measure it, and clear the process while your production plan is still open — then the volume order runs against a proven, predictable clock. Qualify first, schedule second, and the first article never becomes the bottleneck in your plan.
What happens after you send the drawing?
The response sequence removes schedule unknowns in order. First, the DFM review flags anything that would slow or derail the part. Second, the step count maps your part to a delivery tier. Third, the loading logic explains where the factory's capacity sits. Only then does the quote arrive, with its assumptions stated, so the date you are given is a date you can plan around.
What this shop actually runs
A buyer asking for capability evidence should get a specific answer. The facility behind this guide operates 100+ CNC machines across a 6,800 m2 plant in Dongguan, China, with 100+ staff. The machine list by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Run on compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Run on prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Run on long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Run on shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Run on hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands held: ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, ±0.002 mm on precision grinding and wire EDM. Capability indices: Ppk >= 1.67 initial on key characteristics; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded - disclosed openly), ISO 14001:2015 (116024/B/0001/UK/En). Certificates are issued to Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005).
Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa. Based in China, serving customers worldwide.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Get the breakdown behind your delivery date.
Email [email protected] or call +86 13126536955 with your drawing — the step count and tier come back in writing.
Frequently Asked Questions
How do I request a lead-time and capacity breakdown?
Send your STEP, IGES, or 2D drawing to [email protected]. The response includes a design-for-manufacturing review, the process-step count, the delivery tier your part falls into, and the loading behind the date.
Who is the contact person?
Felipe Iglesias handles inquiries at [email protected] and +86 13126536955, working in English, Portuguese, Spanish, French, and Chinese. Scheduling and capacity questions can be raised directly in the language you prefer.
Where is the factory located?
No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470. A factory visit is welcome, and a live video walk of the floor is available for buyers who cannot travel.
What should I include when I request a quote?
A 3D model, a toleranced 2D drawing, the material grade, the quantity, and your target date. A complete package removes the clarification loops that would otherwise show up as added setup time and a slipped schedule.
Can I confirm the delivery date before committing?
Yes. The quote states the step count, the delivery tier, and the loading logic, so the date is something you can hold the factory to. A date with no stated logic is a wish, not a plan.
Standards referenced on this page
- ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
- ISO 9001 — Quality management systems — Requirements
- ASTM E8/E8M-21 — Standard Test Methods for Tension Testing of Metallic Materials
